The three-phase project consisted of a new 4,100 square-foot ER and MRI addition, which doubled the amount of treatment areas and created a dedicated space for emergency pediatric care. In addition, we completely renovated 3,500 square-feet of existing space with upgrades to medical equipment and information technology. Welliver self-performed all demolition and masonry.
The building façade was constructed with two colors of brick to match the existing, a curtain wall, storefront, metal panels, and automatic entrance doors. The scope also included new entrance roads, parking, and a helicopter landing area.
Major electrical renovations of existing service required intense coordination with department heads to ensure critical systems were not impacted by shutdowns and necessary pre-work for the installation of the new Normal Power Service and Emergency Power Service. Old air handling units were taken out of service and replaced with a new RTU. Major coordination effort ensured space temperatures were maintained to avoid impacting patients and staff. ICRA plans were implemented for coordination and relocation of staff as well as redirection of hospital interior and exterior pedestrian traffic.