We use cookies and related technologies to personalize and enhance your experience on our site. By continuing to use this site you agree to the use of cookies and related tracking technologies. Our privacy policy is available here.

Dismiss
  • Who We Are
    • Who We Are Overview
    • Meet Our Leadership
    • Our Values
    • Company Evolution
    • Community Outreach
  • What We Do
    • What We Do Overview
    • Pre-Construction
    • Construction Management
    • General Construction
    • Design/Build
    • Value Add Services
  • Markets We Serve
    • Markets We Serve Overview
    • Healthcare
    • Higher Education
    • Industrial
    • K-12 Education
    • Commercial/Residential
  • Blog
  • Contact Us
  • News
  • Careers
    • Careers Overview
    • Meet Our People
  • Subcontractors
  • Safety
Welliver - Plan | Manage | Build
Telephone icon 1.800.376.3051 Email icon [email protected]
LinkedIn Twitter Facebook
  • News
  • Careers
  • Subcontractors
  • Safety
Welliver - Plan | Manage | Build
  • Who We Are
  • What We Do
  • Markets We Serve
  • Blog
  • Contact Us

Guthrie Healthcare System

Robert Packer Hospital, Emergency Department Expansion & Renovation

In collaboration with the Guthrie construction team, Welliver provided general contracting services for the phased renovation of the existing ICU and Emergency Departments within Robert Packer Hospital. Our integrated team renovated approximately 21,000 SF of the Emergency Department on the second level as well as the 4,500 SF addition to the West Building of the hospital, originally constructed in the 1970’s. Phase II of the West Building addition involves a concrete foundation, concrete slab, structural steel columns, beams with metal B decking, and EPDM roofing.

Construction was challenged by an existing tunnel system causing the concrete foundation to be 15’ deep with limited space on site. Using trench boxes, the excavation spoils were removed from the site safely, thus allowing for the concrete piers to be installed.

Acknowledging the critical need to eliminate any interrupton to patient care during construction, our team was vigilant and constantly aware of the active hospital space above and below the project site.

Project Details

Location:: Sayre, PA

Project Size:: 21,000 SF Renovation. 4,500 SF Addition.

Welliver Role:: General Contractor

Architect:: NORR Partners

Markets We Serve

Commercial/Residential » Healthcare » Higher Education » Industrial » K-12 Education »
  • Who We Are
  • What We Do
  • Markets We Serve
  • Blog
  • Contact Us
  • News
  • Careers
  • Subcontractors
  • Safety
  • Privacy Policy
Welliver - Plan | Manage | Build
LinkedIn Twitter Facebook