Welliver managed the construction of numerous projects identified in the District’s capital improvement plan. Leveraging our experience using the Keystone Bid System, we engaged qualified and skilled contractors to perform on several initiatives at the high school and bus garage.
After removing the existing surface from the high school track, our project team installed new blacktop and rubber surface. In addition, we removed and replaced the perimeter fence and gates as well as installed a new dry-laid stone retaining system along the main bleacher area.
All existing fire alarm panels were replaced while carbon dioxide detection systems were installed in all school buildings. Our team completed a total roof replacement at the Transportation facility. Renovations in the high school auditorium included the removal and installation of new house lighting, stage rigging, stage lighting, and a state-of-the-art lighting control system. In addition, we installed a new multi-media screen and projector system. Following the initial capital improvements, Welliver updated the computer network system cabling and closets as well as rewired all camera and speaker locations.