Construction is one of the most innovative and adaptable industries.
by Drew Bloss, Project Manager
Innovation and technological advances within the construction industry are changing the way in which we work on a daily basis, and are helping us as construction professionals to produce stellar projects in an unprecedently efficient manner. I’m currently working on the North Campus Residential Expansion (NCRE) project at Cornell University and out of all of the projects I have worked on throughout the past 8 years, this project leverages the industry’s latest advancements and innovations more so than any other I’ve experienced in my career. Prefabrication and LEAN Construction techniques are two areas specifically that this project excels at, so I feel it would be interesting to share a few high-level examples of each.
Prefabricated Materials
At the conclusion of the NCRE project, there will be just over 2,000 new beds available to Cornell freshman and sophomores across 5 separate buildings. With this many occupants comes the need for a whole lot of bathrooms. From framing and rough-ins to the finishes and fixtures, constructing stick-built bathrooms is typically a very time-consuming process as nearly every trade has to contribute in some way, shape, or form.
At NCRE, we have streamlined this process by having the bathrooms premanufactured off-site and delivered when they are needed. Premanufactured bathrooms will be installed in most suites and individual residences throughout the buildings, totaling to a count of 432. We refer to these bathrooms as PODs, as they look like a framed box from the outside, but on the inside, they are fully finished bathrooms.
A few of my colleagues and I took a trip out to Ohio where these PODs are being manufactured to review the process. The production is set up in an assembly line fashion and at any given time, there are approximately 50 PODs on the line in various stages of assembly and finishing. It takes roughly 26 days for a single POD to make its way from the start of production to punch list completion, and every day 2 PODs come off of the line and two new PODs are added. This results in a production rate of 10 finished PODs a week, a timeline that would be tough to match with traditional on-site construction methods. On average, we set anywhere between 4 to 6 bathroom PODs in a single day and once a POD is set, there is minimal work that needs to be done until the PODs are framed in with the rest of the floors. By assembling bathrooms off-site, their production can be independent of the tasks that are occurring on-site, and visa-versa. This saves a substantial amount of time, and frees up manpower to focus their efforts elsewhere.
Prefabrication has also been utilized for the buildings’ exterior envelopes. Exterior wall systems can vary greatly in how they are constructed and the time it takes to bring them together, so manufacturing all of the necessary structural components and control layers of exterior walls off-site in controlled environments is an obvious time saver and allows for more aggressive scheduling. The majority of the buildings on this project have envelopes that are made up of pre-cast concrete wall panels. Across all of the buildings, there is a total of 1,570 wall panels, accounting for approximately 220,000 SF of building frontage. Each wall panel is comprised of an interior wythe of concrete, polyiso foil-faced insulation, an exterior wythe of concrete, and individual terracotta tiles that make up the architectural face of the panels. All of these components are cast together in two phases to create a unitized exterior wall panel. When they arrive at the job site, they are set one at a time by a crane and locked into place, immediately forming an insulated exterior wall. From there, panels need to be caulked from both the in and outside, and windows are installed in their designated openings. At a rate of roughly 8 wall panels a day, this process quickly encloses the buildings, which is a critical milestone for all downstream tasks within the building.
LEAN Construction
An essential aspect of managing construction projects is to always know where the project is in relation to the master schedule. It’s extremely hard for a project to be successful if milestones are not closely tracked and tasks not scheduled on a weekly basis. At the time that I am writing this, we have nearly 300 people on-site every day, working in all 5 buildings. The buildings are all in various stages of construction, anywhere from foundations and steel erection to taping and painting, and everywhere in between. It was essential that a process be put in place early on in the project that would enable Welliver as the CM, as well as all of trade partners and the client to understand what stage of the project we were in at any given time, and what tasks would be coming up in the near future. It was also important to be able to break down a 3-year long project into more manageable and less overwhelming chunks.
Ultimately the decision was made to utilize a LEAN Construction technique known as Pull Planning. As part of the Pull Planning process, we meet 3 days a week with the foremen, superintendents, and project managers of all trade partners to collaborate and develop a sequence of tasks that ensure that the project as a whole is staying on schedule. The purview of a Pull Planning meeting is typically 3 weeks ahead, although we often plan for certain milestones that are several weeks to months out. With this approach, everyone is made aware of what each trade’s tasks are and what they need in order to get it done. It is also extremely helpful in identifying potential issues well in advance since there are so many different perspectives that are involved in the planning process. We are nearly a year into the project at this point in time and so far, this process has been extremely successful. It creates a sense of teamwork between contractors and the CM, which breeds an overall culture of focus, accountability, and comradery.
Prefabrication and LEAN Construction techniques are only a few of the many examples of how the NCRE project is taking advantage of the latest innovations and technologies that the construction industry has to offer. It’s important to note though that although these things help to make the construction process more efficient and effective, it takes an extremely dedicated and organized team of people to make it all work. Between my colleagues on the CM team and the trade partners putting the work in place, the NCRE project has a truly impressive group of individuals that put their best foot forward on a daily basis to ensure that this monumental project is a success. I’m grateful to have the opportunity to be a part of it.
Drew has been applying advanced construction technology to projects for nearly a decade. He recognizes that every project has its own set of unique variables such as the weather, availability of materials, cooperation from project members, changes in scope, and constructability issues. One of the most challenging aspects of being a project manager is identifying and handling those variables while maintaining the project budget and schedule. Leveraging significant experience working with construction technology and innovative methods, Drew applies this knowledge to make the construction process more efficient.
Every business is now faced with the challenges of these unprecedented times. We as employers in the construction industry must move forward to the re-opening of our businesses – to complete our projects on time and bring our employees back to work all while complying with New York State guidelines and ensuring our job sites are safe for everyone. Construction has been able to continue to operate in a limited capacity through these challenging times while navigating the numerous changes and protocols.
As we move forward through these uncertain times, the overwhelming theme is to continue social distancing and follow the directives issued by State and Local governments. An updated executive order was issued by Governor Cuomo’s office this past Friday morning 3/27 at 9:15 am –
As you are aware, the New York State Education Department (NYSED) requires all public school districts and Board of Cooperative Educational Services (BOCES) in New York to complete a Building Condition Survey (BCS) for occupied public school buildings every five years. In late 2019, changes in the New York State Education Law were enacted which alters the five year cycle schedule for school districts to conduct these surveys. After years of lobbying by the New York State School Facilities Association, this was a welcome change.
Welliver employees come to work each day to construct buildings. Our efforts typically support customers in organizations whose jobs are not directly related to construction but rather, in manufacturing, education, medical care, retail sales, wholesale, warehouse storage, etc. Subject to dynamic influences, the facilities in which they work may be too small, inefficient, unattractive, unsafe, or otherwise unsatisfactory. Recognizing this, someone in pursuit of excellence may champion a project fostering new-found excellence. Thus, a project is born.
Welliver is a victor of collaboration with disadvantaged, minority, and women owned companies (D/MWBE). As a general contractor and construction manager, Welliver is cognizant of D/MWBE and Equal Employment Opportunity (EEO) requirements in all bidding situations. We are seeing an increase in requests to meet the D/MWBE goals. In these situations, Welliver uses the New York State database along with Welliver’s proprietary D/MWBE vendor database to reach out to certified companies in the region which match the scope of work needed for that particular project. We recognize the importance of including as many D/MWBE companies in our bidding process to ensure a high level of participation. If the requirements cannot be met, it is also important that Welliver has proof of adequate “good faith efforts” and communication in our attempt to find certified D/MWBE’s for any project. Several of our projects, such as the Hill-Rom/Welch Allyn Inc. Warehouse Expansion, Rochester Institute of Technology Magic Spell Studios, and Schuyler Hospital Expansion, have D/MWBE and EEO goals with state, federal or grant funding associated with the contract.
When it came to choosing my area of study for college, the choice seemed very difficult because I was being asked to pick what I wanted to do for the rest of my life. Some classes in high school gave me an idea of what I wanted to do. I ultimately chose Civil Engineering because of the broad scope of what I could do with that education. I knew I enjoyed seeing things get built and I wanted to be a part of that.
ion is a bottom up approach which results in collaborative team commitment, a production planning system, management of workflow, and building reliability. We take a proactive stance to make work happen by removing constraints ahead of time as much as possible. The end result of the production planning system is to achieve a daily detail of the project and resource allocation to complete tasks reliably, efficiently, and effectively. The following compares a Lean approach to traditional project management for project planning:
e construction industry is constantly evolving to become more efficient, hurdle barriers, and conform to increasingly stringent safety and code regulations. Over the course of the next 3 to 5 years and potentially beyond, the industry will need to adapt again. This time the lack of qualified manpower will become a primary obstacle. As the market begins to pick up steam, we are seeing an increase in construction in our local market. However, the amount of high school graduates who are choosing to go into the trades is decreasing while the average age of the trades worker is increasing. Over the past 3 years we have seen manpower become a limiting factor for projects, and it is only getting worse. Unless innovative solutions are implemented into the construction progress this is going to drive cost and schedule in a negative direction for owners.
Quite often the construction company is faced with changes in policy or procedure for a variety of different reasons. There are many things that affect the way that a change is implemented. When faced with these changes, it is very important to balance communication to your employees while satisfying the legal side of the business.